Domain review

Infrastructure

Measures whether physical and digital systems can support the country.

47/100
no changeChange since the August 2026 release
Latest data step+9 ptsChange between each indicator's two latest observations, which may span several months of releases.
Longer run movement(20232026)18  ptsChange over the domain trend between the two periods shown; neither a release comparison nor a single data step.
Medium0.815 component metrics

Infrastructure is currently rated Strained. The domain score is driven primarily by Rail cancellations (GB), Industrial electricity price premium and Grid connection queue delay. Data confidence is medium across its component metrics.

Component indicators

Infrastructure · Metrics

63% above IEA median industrial price

2024

59
Stress
50
Trend
stable
80%
Confidence
Medium0.80
+1ptssince the August 2026 release

Verified official value from DESNZ (UK industrial electricity premium vs IEA median), accessed 2026-08-13.

Permalink ↗
SeedAdministrative
7.54median years to connection offer

2025

37
Stress
0
Trend
improving
60%
Confidence
Low0.60
+1ptssince the August 2026 release

Seed value. No published official figure exists for this indicator yet, so a provisional placeholder is shown in its place.

Permalink ↗
VerifiedOfficial
4.1% trains cancelled or part-cancelled

2024–25

63
Stress
100
Trend
deteriorating
85%
Confidence
High0.85
+1ptssince the August 2026 release

Verified official value from ORR (trains cancelled, GB), accessed 2026-06-13.

Permalink ↗
17% local roads needing maintenance consideration

To Mar 2025

35
Stress
50
Trend
stable
70%
Confidence
Medium0.70
2ptssince the August 2026 release

Verified official value from DfT (local roads needing maintenance (unclassified), England), accessed 2026-06-13.

Permalink ↗
VerifiedOfficial
89% of premises with gigabit-capable broadband

2026

20
Stress
39
Trend
improving
90%
Confidence
High0.90
8ptssince the August 2026 release

Verified official value from Ofcom (ofcom_connected_nations), accessed 2026-06-23.

Permalink ↗

Historical values

Historical values

Industrial electricity price premium

Latest

63% above IEA median industrial price

Industrial electricity price premium · % above IEA median industrial price · reported values, not stress scores.

Historical values

Grid connection queue delay

Latest

7.54median years to connection offer

Grid connection queue delay · median years to connection offer · reported values, not stress scores.

Historical values

Rail cancellations (GB)

Latest

4.1% trains cancelled or part-cancelled

Rail cancellations (GB) · % trains cancelled or part-cancelled · reported values, not stress scores.

Historical values

Local road condition (England)

Latest

17% local roads needing maintenance consideration

Local road condition (England) · % local roads needing maintenance consideration · reported values, not stress scores.

Historical values

Gigabit broadband coverage

Latest

89% of premises with gigabit-capable broadband

Gigabit broadband coverage · % of premises with gigabit-capable broadband · reported values, not stress scores.

Data provenance

Sources for this domain

OrganisationDatasetTypeFrequencyLink
Department for Energy Security and Net ZeroEnergy price statistics incl. international comparisonsOfficialQuarterly/AnnualSource ↗
National Energy System OperatorTransmission connections queue dataAdministrativePeriodicSource ↗
Office of Rail and RoadPassenger rail performanceOfficialQuarterlySource ↗
Department for TransportRoad conditions in EnglandOfficialAnnualSource ↗
OfcomConnected Nations (broadband and mobile coverage)OfficialAnnualSource ↗

How the Infrastructure domain is scored

The domain score is the median of the 5 component metric stress scores. Using the median reduces sensitivity to a single anomalous metric.

Each metric stress score is calculated as:

metric_stress = clamp(0.6 × level_score + 0.3 × trend_score + 0.1 × volatility_score, 0, 100)

The Infrastructure domain carries a weight of 3% in the national index. Full methodology: methodology page.

Sensitivity analysis

What would move this domain?

The Infrastructure domain score is most sensitive to its two highest-stress indicators. Meaningful improvement in either of the following metrics would be the most direct path to improving the domain score:

  • 63

    Rail cancellations (GB)

    Percentage of scheduled trains in Great Britain that were cancelled or part-cancelled, measuring the reliability of the national rail network.

  • 59

    Industrial electricity price premium

    UK industrial electricity price as a percentage above the IEA median for comparable industrial economies, measuring competitive disadvantage from energy costs.

Related analysis

The data centre rushUK

Critical national infrastructure since 2024, five AI Growth Zones, tens of billions announced and a 50 GW connection queue, yet the first official electricity figures arrived only in June 2026 and no official count of the sites exists. In Scotland, where the energy case is strongest, a 7,200 comment planning file, a refused Edinburgh scheme and a ministerial takeback tell the backlash story.

Broadband and mobile coverage across the UKUK

Full fibre, gigabit and mobile availability across the UK, the premises still without a decent connection, and how it varies by nation and local area.

UK air traffic control failures: the record, the cost and what changedUK

The NATS flight data system failed on 8 September 2026, three years after the 2023 failure that hit over 700,000 passengers and cost £75m to £100m. What the official reviews found, how the 34 recommendations were signed off as complete, why NATS beats its delay target on a normal day, how UK airspace compares with Europe, and why Heathrow, 2,130 movements under its cap, cannot absorb a lost afternoon.

UK rail reliabilityUK

Punctuality and cancellations by train operator, who is most and least reliable, from the Office of Rail and Road.

Road condition across the UKUK

What share of roads need repair, by local authority in England and council in Scotland, and where West Lothian sits.

Electric vehicle charging across the UKUK

The public charging network growing fast but unevenly, by nation and local area, with Scotland ahead and Northern Ireland far behind.

Water leakage and reliabilityEngland & Wales

About a fifth of water lost to leaks, which companies leak most, who is improving, and where supply is least reliable. The companion to sewage.