Data as of June 2026, checked
transport · the national record
UK rail reliability: punctuality and cancellations
Britain's rail network runs around 1.9 million train services a quarter. In the latest quarter (Apr to Jun 2026), 68.06% of recorded station stops arrived within 59 seconds of schedule and 84.98% arrived within 3 minutes. The Public Performance Measure, which counts trains reaching their final destination on time, stood at 84.73%. Cancellations ran at 4.07% of trains planned. This page maps what the numbers say, where they are worst, and how the network has changed since 2019.
How to read this
Punctuality and cancellation figures are published quarterly by the Office of Rail and Road (ORR), using data provided by Network Rail. The on time measure counts whether each recorded station stop is reached within 59 seconds of the scheduled time. The Public Performance Measure (PPM) counts whether a train reaches its final destination within 5 minutes (commuter and regional) or 10 minutes (long distance) of schedule. The cancellations figure combines full cancellations and half weight part cancellations. Data cover Great Britain; Northern Ireland's railways are not included.
Computed from ORR Table 3133 (punctuality by operator, quarterly, April 2014 to June 2026), Table 3123 (cancellations by operator and cause, quarterly, April 2019 to June 2026), and Table 3113 (PPM by operator, quarterly, April 2019 to June 2026). All published 17 September 2026 under Open Government Licence v3.0. The latest quarter (April to June 2026) is provisional.
Latest period: Apr to Jun 2026 (provisional). Published 17 September 2026.
National trend
How punctuality has moved since 2019
Before the pandemic, around 9 in 10 trains were meeting the Public Performance Measure. Punctuality deteriorated sharply in 2021 to 2022 as services recovered unevenly and the network faced a combination of staff shortages, infrastructure faults, and industrial action. In the latest quarter, 84.98% of station stops were reached within 3 minutes of schedule and the PPM stood at 84.73%. The strict on time measure (within 59 seconds) gives a harder read: 68.06%.
Proportion of recorded station stops reached within 59 seconds of schedule. Annual average across four quarters. Source: ORR Table 3133.
Cancellations
The rise in cancelled trains
Cancellations have risen substantially since 2019. In the first quarter of 2019/20, 2.42% of trains were cancelled. The rate peaked at 4.07% in 2024/25 (annual average). In the latest quarter, the national rate was 4.07%.
Cancellations include full cancellations and half weight part cancellations. Annual average across four quarters. Source: ORR Table 3123.
By operator
Which train companies are most and least reliable
Performance varies considerably across train operating companies. In the latest quarter (Apr to Jun 2026), Greater Anglia had the highest on time rate at 81.93%, while Avanti West Coast had the lowest at 38.05%. On cancellations, Hull Trains had the fewest at 1.17% and CrossCountry had the most at 7.96%. Lumo (West Coast) began on 25 May 2026 and is listed below, but a part quarter is not ranked against full ones. Operators differ in type of service: commuter, long distance, and freight mix all affect scores.
Best on time rate (Apr to Jun 2026)
Lowest on time rate (Apr to Jun 2026)
Highest cancellation rate (Apr to Jun 2026)
Operators sorted worst to best. Bars scaled to CrossCountry (highest rate). Aggregate region rows excluded.
Questions this raises
For passengers and policy
- 1.
Cancellations are higher now than in 2019, even after emergency timetabling was introduced to improve reliability. What structural changes would bring the rate down?
- 2.
The gap between the best and worst operators is large. How much of that reflects network infrastructure and route type rather than operator performance?
- 3.
The on time (59 second) measure is far stricter than PPM. Should passengers be told more clearly which clock the industry uses to report reliability?
- 4.
Strike action and infrastructure faults have both driven cancellations. How should the two be reported separately so passengers can distinguish systemic from industrial causes?
Sources & method
Data provenance
- Table 3133: Train punctuality at recorded station stops by operator (ORR) ↗· Open Government Licence v3.0
- Table 3123: Trains planned and cancellations by operator and cause (ORR) ↗· Open Government Licence v3.0
- Table 3113: Public Performance Measure by operator and sector (ORR) ↗· Open Government Licence v3.0
- Table 3103: Historic trains planned, PPM, and CaSL by operator (ORR) ↗· Open Government Licence v3.0
Caveats & data notes
- Data for the latest quarter (April to June 2026) are provisional and may be revised in future releases.
- Lumo (West Coast) began operating on 25 May 2026, so its April to June 2026 figures cover about five weeks of service and are not comparable with a full quarter at other operators. Govia Thameslink Railway became part of the Department for Transport Operator on 31 May 2026 and is now listed as Greater Thameslink Railway.
- The on time measure (trains arriving within 59 seconds) is stricter than PPM (5 or 10 minutes to final destination). They measure different things and should not be compared directly.
- PPM thresholds differ by service type: 5 minutes for London and South East, Regional, and Scotland operators; 10 minutes for long distance operators. This affects cross operator comparisons.
- Cancellations figures combine full cancellations and half weight part cancellations. A train that runs half its route counts as 0.5 of a cancellation.
- Data cover Great Britain. Northern Ireland Railways is not included.
- Some operators have suspended services or changed franchise during the period (notably during the pandemic). Rows marked [z] indicate data not applicable for that period.
- Punctuality data are sourced from Network Rail and refreshed every four weeks. Small revisions between quarters are normal.
- Contains public sector information licensed under the Open Government Licence v3.0.
Every figure on this page traces to its official source. Share it as it stands.
Keep going
Related deep dives
Critical national infrastructure since 2024, five AI Growth Zones, tens of billions announced and a 50 GW connection queue, yet the first official electricity figures arrived only in June 2026 and no official count of the sites exists. In Scotland, where the energy case is strongest, a 7,200 comment planning file, a refused Edinburgh scheme and a ministerial takeback tell the backlash story.
The NATS flight data system failed on 8 September 2026, three years after the 2023 failure that hit over 700,000 passengers and cost £75m to £100m. What the official reviews found, how the 34 recommendations were signed off as complete, why NATS beats its delay target on a normal day, how UK airspace compares with Europe, and why Heathrow, 2,130 movements under its cap, cannot absorb a lost afternoon.
Single bus fares in England outside London capped at £2 for all of 2027, backed by £400m. The first £2 cap cut fares 9.1 per cent in a quarter and added about 5 per cent to journeys, while bus miles outside London are down 28 per cent since 2005.
The monthly reading
Get the next one by email
One email a month: the national resilience score, what moved, and the newest analyses like this one, plus The Quarterly Record four times a year. Every figure traced to its official source.