infrastructure · the national record
Electric vehicle charging across the UK
How the public charging network is growing, and how unevenly, from DfT statistics. At 1 April 2026 the UK had about 119,080 public charging devices, around 171.9 per 100,000 people, up by more than half in two years. But provision ranges from dense in inner London to thin across Northern Ireland and the rural North. This page shows how the nations and local areas compare.
How to read this
These are DfT public electric vehicle charging device statistics, counts of publicly available chargers from Zapmap set against population. The fair comparison between areas is devices per 100,000 people. A high figure means dense provision, which in central cities is driven by commercial charging hubs rather than how many residents own an electric car.
DfT Electric vehicle public charging infrastructure statistics, 1 April 2026. Devices per 100,000 population. All four UK nations.
The national picture
Growing fast, spread unevenly
The UK passed 119,080 public charging devices by April 2026, about 171.9 for every 100,000 people and up around 54 per cent in two years. Of those, about 27,372 are rapid or ultra rapid. Growth is real, but where the chargers are is the story: provision is several times denser in some places than others, and the gap is not closing evenly.
Across the four nations
Scotland ahead, Northern Ireland far behind
Scotland has the densest network of the four nations at 228.5 devices per 100,000 people, helped by sustained public investment. Northern Ireland trails badly at 59.4, around a third of the UK average, with every one of its councils in the bottom group nationally.
Public charging devices per 100,000 people, 1 April 2026. Source: DfT.
Place matters
From inner London hubs to the thin spots
Among local authorities, provision runs from 1,380.1 devices per 100,000 people in Hammersmith and Fulham down to under 37 in the thinnest areas. The densest are inner London boroughs, where commercial charging hubs serve commuters and fleets rather than local residents; the thinnest are in Northern Ireland and parts of the rural North and East.
Most dense
Least dense
Public charging devices per 100,000 population, 1 April 2026. Isles of Scilly is set aside as a small outlier. High inner London figures reflect commercial hub density, not how many residents drive an electric car. Source: DfT.
Questions this raises
For the switch to electric
- 1.
Charger numbers are growing fast, but provision is several times denser in some places than others. Will the gaps close before the 2030s, or widen?
- 2.
Scotland is far ahead and Northern Ireland far behind. How much is public investment and how much is the market?
- 3.
The densest areas are inner London commercial hubs. Does a high devices per head figure there really mean it is easy for a resident without a driveway to charge?
- 4.
Rural areas and the North have the thinnest networks. Does that risk leaving the switch to electric to wealthier city regions first?
Sources & method
Data provenance
- Electric vehicle public charging infrastructure statistics, April 2026 (DfT) ↗· Open Government Licence v3.0
Caveats & data notes
- Figures count publicly available charging devices, sourced by DfT from Zapmap, set against population. They do not count home or workplace chargers, which is where most charging happens for drivers with a driveway.
- Devices per 100,000 people is the fair comparison between areas, but in central cities it is inflated by commercial charging hubs that serve commuters and fleets, so it overstates how easy it is for a local resident to charge.
- The headline device count uses a new measure introduced in 2026; the two year growth figure uses the longer running comparable series, so the two are not added together.
- Northern Ireland is a genuine outlier with the thinnest network of any nation.
- Source: DfT electric vehicle public charging infrastructure statistics, 1 April 2026.
Every figure on this page traces to its official source. Share it as it stands.
Keep going
Related deep dives
Critical national infrastructure since 2024, five AI Growth Zones, tens of billions announced and a 50 GW connection queue, yet the first official electricity figures arrived only in June 2026 and no official count of the sites exists. In Scotland, where the energy case is strongest, a 7,200 comment planning file, a refused Edinburgh scheme and a ministerial takeback tell the backlash story.
The NATS flight data system failed on 8 September 2026, three years after the 2023 failure that hit over 700,000 passengers and cost £75m to £100m. What the official reviews found, how the 34 recommendations were signed off as complete, why NATS beats its delay target on a normal day, how UK airspace compares with Europe, and why Heathrow, 2,130 movements under its cap, cannot absorb a lost afternoon.
Ofgem's reliability figures for all 14 electricity licence areas: 35.1 minutes lost per customer a year on average, a 6.6 times gap between London and the north of Scotland, 11 areas missing their targets, £50.9m in penalties, and the winter margin beside the Government's advice to prepare for days without power.
The monthly reading
Get the next one by email
One email a month: the national resilience score, what moved, and the newest analyses like this one, plus The Quarterly Record four times a year. Every figure traced to its official source.